Download the data
The same figures as the site: 62 projects and 497 sourced figures and events, last reviewed 5 Nov 2026. Free to use; please credit Overruns and link to the project page.
- projects.csv
One row per project: first price, latest comparable estimate, the multiple after inflation, delay in months, scope change, last checked.
- observations.csv
One row per figure or event: costs (low, high, point, in billions), deadlines, status changes, milestones and scope changes, each with who said it, when, the source links and the verbatim quotes.
- overruns.json
Everything above in one file, each project with its full history nested.
Reading the files
Costs are in billions of Canadian dollars as announced. dollar_year is the year whose dollars a figure is in. A range has a low and a high; “up to” has only a high.
covers says what a figure measures (capital cost, acquisition, lifecycle). The first price and latest estimate are always on the same basis; figures on other bases are in the observations but never compared.
Multiples are adjusted for inflation with Statistics Canada’s CPI. delay_is_minimum is true when the latest deadline was withdrawn without a new date. last_reviewed is the date this project was last searched for new figures; it is blank until a review logs one. last_monthly_review is the date of the latest site-wide review.
The rules behind every number are on how we count. Updated hourly from the same database as the pages.